|
Project Name:
|
Stormwater Sampling
|
|
Country:
|
None Listed
|
|
Description:
|
Personnel visited the site and set up automatic stormwater sampling equipment at the approximate southeast corner of the property. The sampling equipment was programmed to collect a grab sample during the first thirty minutes of a storm event. The collected sample was analyzed for or submitted for analyses of the applicable parameters. A report that summarized the sampling and analyses was prepared.
|
|